There were SO many more people waiting along the pier in fells point than I expected. Apparently this is a really big deal and super cool thing here. Definitely want to keep doing it every year now. When we got to Akimbo at noon I got the engine going to make sure the inverter worked (it does) but found a new leak somewhere running down the hose between the impeller and engine block. Tom managed to scramble and change it out for the new one crazy fast when taping wasn't helping the leak. The old hose looked kind of worn at the end by the engine so maybe that was it. Anyway no leak anymore. Plus I figured out which metric ratchet wrenches work on the cover over the belts. (And impeller hose.) Successfully re-winterized with no hiccups this time at the end of the night too. Finished up at DSC around 9:30.