Nov 9 - bottom job

Trip dates: 
Saturday, November 9, 2024
Trip length: 
1 day
Type of watercraft: 
Kayak/canoe/rowboat
  • on a mission to kill barnacles

Fixed a few things on the boat including:

-hanging locker pole-forward bracket

- pole lift line upgrade

- o/b bracket off to modify for shorter lower unit 3.5 hp

Put a kayak in for a short paddle and a stint knocking barnies off the rudder and waterline. Analysis: a bottom job in Spring is mamndatory.